2016年1月17日星期日

Overhead Lifting Equipment 600t Shipbuilding Gantry Crane For Handling Workshop

Overhead Lifting Equipment 600t Shipbuilding Gantry Crane


Product Description:
1. Shipbuilding crane is one kind of the gantry crane, mainly for the purpose to assemble the boat.
2. This kind of shipbuilding gantry crane has the function of hoisting, handling, turn over in the air
    in section and so on, the height light function is to turn over and combine the task. Through the 
    two trolley to complete the turn in section, first through the hoisting to adjust it, then make trolley
    to bear the whole section.
3. The crane which used in the shipbuilding place and in the dock, its task just to transport all the 
     spare parts(fillet, structure steel, steel plate) to the fabricate place. This kind of transportation
     task must be completed during a very long travel.

Product Features:
1. The metal structure of the crane mainly includes main girder, rigidity leg, flexibility leg, lower
    horizonal girder, handrail and cabin, etc.
2. The main girder of the crane adopts double girder style, the four rails which are on the surface
  plate of the main girder can provide the traveling of the upper and the lower trolley, one crane 
  with two main hooks, and the hook traveling along the upper flange, and the other one has one hook
  and one auxiliary hook traveling along the lower flange, in case to turn and lift the big size boat.
3. To decrease the self-weight,the rigidity leg adopts the overall box type structure, the flexible
  leg adopts Chinese character "ren" type frame, including upper butt, two pieces round pipe 
  and lower butt.
4. The crane power supply adopts cable drum, the upper and lower adopts suspended cable tackle
  to provide the power, it locates on the top of the two main girders.
5. This crane equipped with overload protected, rail clamping device, anchoring device, wind speed
  and direction indicator and the other limit switch and load monitoring of each mechanism. 

Product Structure:

1. Main girder of gantry crane
    Be welded of steel plates with honeycomb hole,
    connected by high strength precision bolt.
    There is sliding rail for trolley to travel upper the girder
    which is fixed on outrigger by high-tension precision bolt.

2. Traveling mechanism of gantry crane
    -consists of driving gear box and passive wheel box
    - the driving gear box supplies power to finish the crane' travelling.
    -What the difference between driving gear box  
     and passive wheel box is that passive wheel box lacks
     transmission structure such as dynamo, resucer and a pair of exposed gear.

3. Cabin of gantry crane
   - Glass window can make the operator see all the working condition and the cabs
       installed in the front and two sides
   - As a group of independent cabin, fixed outside of cab is connected by control
     cable and linkage station which is set up in the cab.

4. Trolley with gantry crane
    - the trolley is assembled with motor, reducer brake, trolley frame, hook, pulley,
       rain cover and other parts.
    - Include lifting mechanism and crossing travelling mechanism.
    - the trolley is strictly designed according to the application and working environment.

5. Electric system of gantry crane
   - Hoisting motor, long traveling motor and hydraulic power motor are included.
   -The whole electric system is controlled by PLC(programmable logic controller).
   -Two operation modes: cabin and remote control.

6. Platform of gantry crane
  The platform is installed in order to maintain the crane, and the protecting guard
    is added to protect the safety of the staff.

Notice: The wire ropes of trolley need to be examined regularly and changed
             in time if there is a 10% broken wires, loosen wires and wearing down.
Technical Details
Product Specification
  250t × 60m
 300t×108m
 600t×60m
Working Class
               A6 ~ A8

Capacity
Common Lifting

  t
    250
   200
    600
Turning Over
    200
   200
    400
Span
  m
     60
   108
    60
Hoisting Height
  m
     48
    70
    40

Upper trolley
capacity
   t
    100 × 2 
  100 × 2
  200 × 2
Hoisting speed

m/min
    0.5-5-10
  0.5-5-10
   0.4-4-8
Traveling speed
    1~28.5
   3~30
   1~25


Lower trolley

Capacity
main

  t
     100
    150
   300
aux.
      20
     20
    20
Hoisting speed
main

m/min
    0.5-5-10
   0.5-5-10
   0.4-4-8
aux.
      10
    10
     10
Traveling speed
    1~26.5
    3~30
     1~25

Maintenance
Hoist
Capacity
  t
      5
      5
      5
Hoisting speed

m/min
      8
      8
      8
Trolley speed
      20
     20
      20
Rotating speed
r/min
      0.9
     0.9
      0.9
Max. Wheel Load
 kN
     200
     450
      430
Power Source
3-phase A.C. 380V 50Hz ( As your demand)
China Overhead Lifting Equipment 600t Shipbuilding Gantry Crane For Handling Workshop supplier

没有评论:

发表评论